Providing Collaborative Education with an International Dimension: An Ulster University and Pennsylvania State University Case Study

The BIM process, encompassing the use of Common Data Environments CDEs, collaborative working and the sharing of approved, up-to-the-minute information, has revolutionized the construction industry. However, this method of delivery is something which is alien to many needing a paradigm shift in communication methods Homayouni et al, 2010, as most are more familiar with traditional approaches such as email communication and sharing communication and sharing 'marked up' hard copies of drawings. In the technology driven world in which we live, it is important that those entering the industry from this point forward have an appreciation of this way of working. Therefore, this paper will provide an overview of a collaborative project which has been undertaken at Ulster University to help undergraduate students become familiar with this new way of working and communicating. The paper will outline how the students worked in multidisciplinary teams on a hypothetical building project, before collaborating asynchronously with students from Pennsylvania State University.

[1]  Burcin Becerik-Gerber,et al.  The pace of technological innovation in architecture, engineering, and construction education: integrating recent trends into the curricula , 2011, J. Inf. Technol. Constr..

[2]  Carrie Sturts Dossick,et al.  Organizational Divisions in BIM-Enabled Commercial Construction , 2010 .

[3]  Z. Ren,et al.  Construction claims management: towards an agent‐based approach , 2001 .

[4]  Robert Eadie,et al.  An investigation of interoperability issues between building information modelling (BIM) and e-procurement , 2015 .

[5]  A. Akintoye,et al.  A survey of supply chain collaboration and management in the UK construction industry , 2000 .

[6]  Robert Eadie,et al.  Teaching BIM in a multidisciplinary department , 2014 .

[7]  Burcin Becerik-Gerber,et al.  Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .

[8]  Zeeshan Aziz,et al.  A case study of fostering multidisciplinary in built environment using BIM , 2015 .

[9]  Kihong Ku,et al.  BIM Experiences and Expectations: The Constructors' Perspective , 2011 .

[10]  Malachy Mathews,et al.  BIM collaboration in student architectural technologist learning , 2013 .

[11]  L. Koskela,et al.  Collaborative supply chain practices during severe economic downturn in the Republic of Ireland , 2012 .

[12]  Hafez Salleh,et al.  The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance , 2014 .

[13]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[14]  Song Wu,et al.  A technical review of BIM based cost estimating in UK quantity surveying practice, standards and tools , 2014, J. Inf. Technol. Constr..

[15]  David A. Duce,et al.  Early stage multi-level cost estimation for schematic BIM models , 2012 .

[16]  Rafael Sacks,et al.  Teaching Building Information Modeling as an Integral Part of Freshman Year Civil Engineering Education , 2010 .

[17]  Willem Kymmell,et al.  Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations , 2007 .

[18]  David Comiskey,et al.  Comparing Common Data Environment Platforms for Student Collaborative Working , 2016 .

[19]  Mohammed Abdullah Eben Saleh The Automation of Cost Estimate: An Improvement in Construction Project Information under Design, Tendering and Execution , 1999 .

[20]  Emine Mine Thompson,et al.  Uptake of BIM and IpD within the UK AEC Industry: The Evolving Role of the Architectural Technologist , 2011 .

[21]  Andrew R.J. Dainty,et al.  The extent of team integration within construction projects , 2006 .

[22]  Robert Eadie,et al.  An analysis of the drivers for adopting building information modelling , 2013, J. Inf. Technol. Constr..

[23]  Carrie Sturts Dossick,et al.  Theoretical Categories of Successful Collaboration and BIM Implementation within the AEC Industry , 2010 .

[24]  Willy Sher,et al.  Exploring AEC education through collaborative learning , 2014 .

[25]  Amm Liu,et al.  Research Methods for Construction (3rd ed.) , 2008 .

[26]  Daniel Forgues,et al.  Can procurement affect design performance , 2008 .

[27]  Aj Marshall-Ponting,et al.  An nD modelling approach to improve communication processes for construction , 2005 .

[28]  Peter Brandon Research and development of expert systems for the construction industry , 1992 .