Re-scheduling in railway networks
暂无分享,去创建一个
Xin Yao | Xiaojun Wu | Jun Sun | Wei Fang
[1] Dario Pacciarelli,et al. A tabu search algorithm for rerouting trains during rail operations , 2007 .
[2] Dominique Feillet,et al. A MIP-based local search method for the railway rescheduling problem , 2011, Networks.
[3] Dario Pacciarelli,et al. Optimal inter-area coordination of train rescheduling decisions , 2011 .
[4] Marco Laumanns,et al. A model predictive control approach for discrete-time rescheduling in complex central railway station areas , 2012, Comput. Oper. Res..
[5] Alexander Fay,et al. A fuzzy knowledge-based system for railway traffic control , 2000 .
[6] Edward Tsang,et al. Constraint Based Scheduling: Applying Constraint Programming to Scheduling Problems , 2003, J. Sched..
[7] Michele Missikoff. An object-oriented approach to an information and decision support system for railway traffic control , 1997, Proceedings of 1st International Conference on Conventional and Knowledge Based Intelligent Electronic Systems. KES '97.
[8] Johanna Törnquist,et al. Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms , 2005, ATMOS.
[9] Yung-Hsiang Cheng,et al. A Fuzzy Petri Nets approach for railway traffic control in case of abnormality: Evidence from Taiwan railway system , 2009, Expert Syst. Appl..
[10] Ismail Sahin,et al. Railway traffic control and train scheduling based oninter-train conflict management , 1999 .
[11] Norbert Pavlovic,et al. A fuzzy Petri net model to estimate train delays , 2013, Simul. Model. Pract. Theory.
[12] Dario Pacciarelli,et al. Assessment of flexible timetables in real-time traffic management of a railway bottleneck , 2008 .
[13] Johanna Törnquist. Railway traffic disturbance management — An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon , 2007 .
[14] Sung-Pil Hong,et al. An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network , 2011 .
[15] Ravindra K. Ahuja,et al. Integer programming based solution approaches for the train dispatching problem , 2010 .
[16] Dario Pacciarelli,et al. Models and Algorithms for Tra ± c Management of Rail Networks , 2005 .
[17] Norio Tomii,et al. Train Rescheduling Algorithm Which Minimizes Passengers' Dissatisfaction , 2005, IEA/AIE.
[18] Dominique Feillet,et al. SAPI: Statistical Analysis of Propagation of Incidents. A new approach for rescheduling trains after disruptions , 2011, Eur. J. Oper. Res..
[19] Jan A. Persson,et al. Train Traffic Deviation Handling Using Tabu Search and Simulated Annealing , 2005, Proceedings of the 38th Annual Hawaii International Conference on System Sciences.
[20] Paolo Toth,et al. A Lagrangian heuristic algorithm for a real-world train timetabling problem , 2006, Discret. Appl. Math..
[21] Belarmino Adenso-Díaz,et al. On-line timetable re-scheduling in regional train services , 1999 .
[22] Twan Dollevoet,et al. Delay Management Including Capacities of Stations , 2012, Transp. Sci..
[23] Anita Schöbel,et al. To Wait or Not to Wait - And Who Goes First? Delay Management with Priority Decisions , 2010, Transp. Sci..
[24] Matteo Fischetti,et al. Local branching , 2003, Math. Program..
[25] J. P. Norton,et al. Optimal traffic control at railway junctions , 1997 .
[26] Joaquin Rodriguez,et al. A constraint programming model for real-time train scheduling at junctions , 2007 .
[27] Johanna Törnquist Krasemann. Design of an Effective Algorithm for Fast Response to the Rescheduling of Railway Traffic During Disturbances , 2012 .
[28] Afeez Ayinla Sanusi. Train Dispatching: Heuristic Optimization , 2006 .
[29] Anita Schöbel,et al. Capacity constraints in delay management , 2009, Public Transp..
[30] Philippe Baptiste,et al. Constraint - based scheduling : applying constraint programming to scheduling problems , 2001 .
[31] Andrea D'Ariano,et al. Conflict Resolution and Train Speed Coordination for Solving Real-Time Timetable Perturbations , 2007, IEEE Transactions on Intelligent Transportation Systems.
[32] Ennio Ottaviani,et al. A Traffic Management System for Real-time Traffic Optimisation in Railways , 2007 .
[33] E. Schnieder,et al. Automated Dispatching Of Train OperationsUsing Genetic Algorithms , 2004 .
[34] Johanna Törnquist Krasemann. Greedy algorithm for railway traffic re-scheduling during disturbances: A Swedish case , 2010 .
[35] Tao Tang,et al. Real-Time Train Rescheduling in Junction Areas , 2010 .
[36] J Jacobs. Reducing delays by means of computer-aided 'on-the-spot' rescheduling , 2004 .
[37] Håkan Grahn,et al. A Parallel Re-Scheduling Algorithm for Railway Traffic Disturbance Management --- Initial Results , 2011 .
[38] Y. Larroche,et al. SEPIA: A real-time expert system that automates train route management , 1994 .
[39] Tin Kin Ho,et al. Railway junction traffic control by heuristic methods , 2001 .
[40] Narayan Rangaraj,et al. Scheduling and Rescheduling of Railway Operations: A Review and Expository Analysis , 2011 .
[41] Bo Fan. Railway traffic rescheduling approaches to minimise delays in disturbed conditions , 2012 .
[42] Robert C. Leachman,et al. An exact solution procedure to determine the optimal dispatching times for complex rail networks , 2006 .
[43] Dario Pacciarelli,et al. Discrete Optimization A branch and bound algorithm for scheduling trains in a railway network , 2007 .
[44] Matteo Fischetti,et al. Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..
[45] Patrick T. Harker,et al. REAL-TIME SCHEDULING OF FREIGHT RAILROADS , 1995 .
[46] Jan A. Persson,et al. N-tracked railway traffic re-scheduling during disturbances , 2007 .