An improved MOEA/D for multi-objective flexible job shop scheduling with release time uncertainties
暂无分享,去创建一个
Yi Sun | Min Zhang | Xiaoning Shen | Min Zhang | Yi Sun | Xiaoning Shen
[1] Pierre Borne,et al. Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems , 2002, IEEE Trans. Syst. Man Cybern. Part C.
[2] Mostafa Zandieh,et al. Multi-objective scheduling of dynamic job shop using variable neighborhood search , 2010, Expert Syst. Appl..
[3] Xiaodong Li,et al. A decomposition based memetic algorithm for multi-objective vehicle routing problem with time windows , 2015, Comput. Oper. Res..
[4] Wali Khan Mashwani,et al. Multiobjective memetic algorithm based on decomposition , 2014, Appl. Soft Comput..
[5] Qingfu Zhang,et al. MOEA/D with Tabu Search for multiobjective permutation flow shop scheduling problems , 2014, 2014 IEEE Congress on Evolutionary Computation (CEC).
[6] Alireza Fallahi,et al. Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability , 2010 .
[7] Jason R. Schott. Fault Tolerant Design Using Single and Multicriteria Genetic Algorithm Optimization. , 1995 .
[8] Pierre Borne,et al. Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic , 2002, Math. Comput. Simul..
[9] Lothar Thiele,et al. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..
[10] Qingfu Zhang,et al. MOEA/D: A Multiobjective Evolutionary Algorithm Based on Decomposition , 2007, IEEE Transactions on Evolutionary Computation.
[11] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[12] Tarek Y. ElMekkawy,et al. Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm , 2011 .
[13] R. K. Ursem. Multi-objective Optimization using Evolutionary Algorithms , 2009 .
[14] Kenneth Sörensen,et al. A genetic algorithm for robust schedules in a one-machine environment with ready times and due dates , 2004, 4OR.
[15] Qingfu Zhang,et al. MOEA/D for flowshop scheduling problems , 2008, 2008 IEEE Congress on Evolutionary Computation (IEEE World Congress on Computational Intelligence).
[16] Uday K. Chakraborty,et al. Advances in Differential Evolution , 2010 .
[17] Jian Xiong,et al. Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns , 2013 .
[18] Gary B. Lamont,et al. Multiobjective evolutionary algorithm test suites , 1999, SAC '99.
[19] A. C. Lisboa,et al. A Multi-Objective Evolutionary Algorithm Based on Decomposition for Optimal Design of Yagi-Uda Antennas , 2012, IEEE Transactions on Magnetics.
[20] Xin Yao,et al. Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems , 2015, Inf. Sci..
[21] Qingfu Zhang,et al. Multiobjective Optimization Problems With Complicated Pareto Sets, MOEA/D and NSGA-II , 2009, IEEE Transactions on Evolutionary Computation.
[22] Eckart Zitzler,et al. Indicator-Based Selection in Multiobjective Search , 2004, PPSN.
[23] Kenneth N. Brown,et al. Scheduling with Uncertain Release Dates , 2005 .