An optimized planning model for black-start units considering CCHP systems as start units

CCHP (combined cooling, heating and power) systems have good performance as black-start units. It is the most important black-start unit in areas which do not have hydro power units. In this paper, the CCHP system is designed and planned under extra consideration of it serving as a black-start unit. It puts forward an optimized planning (allocation) model for CCHP systems with the consideration of CCHP systems being black-start units. Based on the regional black-start units, black-start schemes and load conditions, the reliability of black-start, outage cost and investment on construction are calculated. Aiming to minimize outage cost and investment on construction, setting simulation results as constraints, building the optimized model and finally applying the Particle Swarm Optimization (PSO) method to attain the best solution. The analysis of example case indicates that the optimized planning proposed here is effective. It gives important reference for the design and planning of CCHP system.

[1]  Li Xu-guang A Power Quality Control Algorithm for Micro-Grid Based on Control Strategy of Inverter Interfaced Distributed Generator , 2010 .

[2]  Liang Hai-ping Optimization of Parallel Restoration Through Power System Partitioning After Blackout , 2009 .

[3]  Zhong Hui-rong A Multi-Objective Optimization Method for Post-Blackout Unit Restoration , 2013 .

[4]  Yu Tao Use of microturbine generation system for power system black-start , 2009 .

[5]  Wen Fushuan,et al.  A Multi-round Negotiation Model for Bilateral Contracting Considering Spot Price Risks in Electricity Market Environment , 2010 .

[6]  Luis M. Serra,et al.  Thermoeconomic Analysis of Simple Trigeneration Systems , 2009 .

[7]  Ye Da-jun,et al.  OPTIMAL PLANNING OFA GAS TURBINE CCHP PLANT , 2004 .

[8]  Zhang Zu,et al.  Black-start Scheme for China Southern Power Grid , 2006 .

[9]  Zhou Hao,et al.  Black-start Decision-making in Smart Grids Using Multi-attribute Group Eigenvalue Method , 2010 .

[10]  Zhu Rui-jin A Series of Blackstart Tests Based on Gas Turbine Generators in Shanghai Power Grid , 2006 .

[11]  Sun Yingyun Blackstart Power Source Planning Based on Maximization of Social Benefit , 2009 .

[12]  Shu Jun A Customer's Outage Cost Assessment Approach Based on the Improved Tobit Model , 2010 .

[13]  Jing Zhaoxia Discussion on the Black Start Scheme of Regional Power Systems , 2005 .

[14]  Hua Ben Distributed Energy System is A Focal Point of the Twelfth Five-year Energy Strategy in China , 2012 .