An optimized planning model for black-start units considering CCHP systems as start units
暂无分享,去创建一个
Yi Sun | Xiaobin Guo | Zhaoxia Jing | Jinyong Lei | Xu Chen | Zhan Shen | Shan Lin
[1] Li Xu-guang. A Power Quality Control Algorithm for Micro-Grid Based on Control Strategy of Inverter Interfaced Distributed Generator , 2010 .
[2] Liang Hai-ping. Optimization of Parallel Restoration Through Power System Partitioning After Blackout , 2009 .
[3] Zhong Hui-rong. A Multi-Objective Optimization Method for Post-Blackout Unit Restoration , 2013 .
[4] Yu Tao. Use of microturbine generation system for power system black-start , 2009 .
[5] Wen Fushuan,et al. A Multi-round Negotiation Model for Bilateral Contracting Considering Spot Price Risks in Electricity Market Environment , 2010 .
[6] Luis M. Serra,et al. Thermoeconomic Analysis of Simple Trigeneration Systems , 2009 .
[7] Ye Da-jun,et al. OPTIMAL PLANNING OFA GAS TURBINE CCHP PLANT , 2004 .
[8] Zhang Zu,et al. Black-start Scheme for China Southern Power Grid , 2006 .
[9] Zhou Hao,et al. Black-start Decision-making in Smart Grids Using Multi-attribute Group Eigenvalue Method , 2010 .
[10] Zhu Rui-jin. A Series of Blackstart Tests Based on Gas Turbine Generators in Shanghai Power Grid , 2006 .
[11] Sun Yingyun. Blackstart Power Source Planning Based on Maximization of Social Benefit , 2009 .
[12] Shu Jun. A Customer's Outage Cost Assessment Approach Based on the Improved Tobit Model , 2010 .
[13] Jing Zhaoxia. Discussion on the Black Start Scheme of Regional Power Systems , 2005 .
[14] Hua Ben. Distributed Energy System is A Focal Point of the Twelfth Five-year Energy Strategy in China , 2012 .