An interval fuzzy robust nonlinear program for the planning of municipal solid waste management systems under uncertainty

Abstract An interval fuzzy robust nonlinear program (IFRNLP) is developed and applied to a municipal solid waste (MSW) management planning problem. The method improves upon existing fuzzy robust programming and interval nonlinear programming by considering dual uncertainties and the effects of economies of scale on the MSW system. The proposed IFRNLP can explicitly address system uncertainties with complex presentations, such as fuzzy sets, interval numbers, and their combinations. The developed IFRNLP is then applied to the planning of a MSW management. The results indicate that reasonable solutions have been generated. They reflect a compromise between optimality and stability of the study system, and are realistic reflections of system complexities such as nonlinear and dual uncertainties. Moreover, when compared with existing methods of interval nonlinear programming and interval fuzzy robust linear programming, IFRNLP can provide a more effective means of reflecting system cost variations and may, therefore, generate more realistic and applicable solutions.

[1]  L. El Ghaoui,et al.  Robust optimization methodologies for the free route concept , 1998, Proceedings of the 1998 American Control Conference. ACC (IEEE Cat. No.98CH36207).

[2]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[3]  G H Huang,et al.  IFRP: a hybrid interval-parameter fuzzy robust programming approach for waste management planning under uncertainty. , 2007, Journal of environmental management.

[4]  Robert E. Chapman,et al.  Evaluating the risks of solid waste management programs: A suggested approach , 1984 .

[5]  Masahiro Inuiguchi,et al.  Robust optimization under softness in a fuzzy linear programming problem , 1998, Int. J. Approx. Reason..

[6]  Guohe Huang,et al.  Grey Chance-Constrained Programming: Application to Regional Solid Waste Management Planning , 1994 .

[7]  Madan M. Gupta,et al.  On fuzzy stochastic optimization , 1996, Fuzzy Sets Syst..

[8]  Yongping Li,et al.  Capacity Planning for Waste Management Systems: An Interval Fuzzy Robust Dynamic Programming Approach , 2009, Journal of the Air & Waste Management Association.

[9]  Didier Dubois,et al.  A synthetic view of belief revision with uncertain inputs in the framework of possibility theory , 1997, Int. J. Approx. Reason..

[10]  Brian W. Baetz Capacity planning for waste management systems , 1990 .

[11]  Didier Dubois,et al.  Qualitative possibility theory and its applications to constraint satisfaction and decision under uncertainty , 1999, Int. J. Intell. Syst..

[12]  Brian W. Baetz,et al.  Optimization/Simulation Modeling for Waste Management Capacity Planning , 1990 .

[13]  Istvan Bogardi,et al.  Fuzzy Decision Making In Dredged‐Material Management , 1991 .

[14]  D. Dubois,et al.  ON FUZZY INTERPOLATION , 1999 .

[15]  Ni-Bin Chang,et al.  A new approach for long term planning of solid waste management systems using fuzzy global criterion , 1997 .

[16]  Sundar Krishnamurty,et al.  A robust multi-criteria optimization approach , 1997 .

[17]  Guohe Huang,et al.  GREY QUADRATIC PROGRAMMING AND ITS APPLICATION TO MUNICIPAL SOLID WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY , 1995 .

[18]  Guohe Huang,et al.  Combining Simulation with Evolutionary Algorithms for Optimal Planning Under Uncertainty: An Application to Municipal Solid Waste Management Planning in the Reginonal Municipality of Hamilton-Wentworth , 2003 .

[19]  Guo H Huang,et al.  A Two-Stage Interval-Stochastic Programming Model for Waste Management under Uncertainty , 2003, Journal of the Air & Waste Management Association.

[20]  R. Słowiński,et al.  Stochastic Versus Fuzzy Approaches to Multiobjective Mathematical Programming under Uncertainty , 1990, Theory and Decision Library.

[21]  Rui Zou,et al.  AN INDEPENDENT VARIABLE CONTROLLED GREY FUZZY LINEAR PROGRAMMING APPROACH FOR WASTE FLOW ALLOCATION PLANNING , 2000 .

[22]  Jitka Dupačová,et al.  Reflections on Robust Optimization , 1998 .

[23]  D. Dubois,et al.  Operations on fuzzy numbers , 1978 .

[24]  Guohe Huang,et al.  Adaption to Climate Change through Water Trading under Uncertainty - An Inexact Two-Stage Nonlinear Programming Approach , 2003 .

[25]  Kriton Curi,et al.  Improving The Efficiency Of The Solid Waste Collection System In i̇zmi̇r, Turkey, Through Mathematical Programming , 1993 .

[26]  B. W. Baetz,et al.  Simulation modelling for the sizing of solid waste receiving facilities , 1993 .

[27]  Guohe Huang,et al.  ITCLP: An inexact two-stage chance-constrained program for planning waste management systems , 2007 .

[28]  S. L. Mehndiratta,et al.  Optimization on Refuse Collection Systems , 1981 .

[29]  Guohe Huang,et al.  A GREY LINEAR PROGRAMMING APPROACH FOR MUNICIPAL SOLID WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY , 1992 .

[30]  Hidetomo Ichihashi,et al.  Fuzzy Programming: A Survey of Recent Developments , 1990 .

[31]  Allen L. Soyster,et al.  Technical Note - Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming , 1973, Oper. Res..

[32]  G. H. Huang,et al.  A hybrid inexact-stochastic water management model , 1998, Eur. J. Oper. Res..

[33]  J. B. Li,et al.  Integration of Stochastic Programming and Factorial Design for Optimal Reservoir Operation , 2003 .

[34]  L. Liu,et al.  An interval nonlinear program for the planning of waste management systems with economies-of-scale effects - A case study for the region of Hamilton, Ontario, Canada , 2006, Eur. J. Oper. Res..

[35]  Guohe Huang,et al.  Grey Dynamic Programming for Waste‐Management Planning under Uncertainty , 1994 .

[36]  Guohe Huang,et al.  Capacity Planning for an Integrated Waste Management System Under Uncertainty: a North American Case Study , 1997 .

[37]  Didier Dubois,et al.  Computing improved optimal solutions to max-min flexible constraint satisfaction problems , 1999, Eur. J. Oper. Res..

[38]  Guohe Huang,et al.  Grey fuzzy integer programming: An application to regional waste management planning under uncertainty , 1995 .

[39]  S. Zenios,et al.  Robust optimization models for managing callable bond portfolios , 1996 .

[40]  G. H. Huang,et al.  A fuzzy-stochastic robust programming model for regional air quality management under uncertainty , 2003 .

[41]  G. H. Huang,et al.  An Interval-Parameter Fuzzy-Stochastic Programming Approach for Municipal Solid Waste Management and Planning , 2001 .

[42]  Stefan Chanas,et al.  On the equivalence of two optimization methods for fuzzy linear programming problems , 2000, Eur. J. Oper. Res..

[43]  Guohe Huang,et al.  GREY FUZZY DYNAMIC PROGRAMMING: APPLICATION TO MUNICIPAL SOLID WASTE MANAGEMENT PLANNING PROBLEMS , 1994 .

[44]  Julian Scott Yeomans,et al.  An Evolutionary Grey, Hop, Skip, and Jump Approach: Generating Alternative Policies for the Expansion of Waste Management , 2003 .

[45]  Ni-Bin Chang,et al.  Cost-effective and equitable workload operation in solid-waste management systems , 1997 .

[46]  Arie Tzvieli Possibility theory: An approach to computerized processing of uncertainty , 1990, J. Am. Soc. Inf. Sci..

[47]  Guohe Huang,et al.  A Stochastic Water Quality Forecasting System for the Yiluo River , 2003 .

[48]  Ni-Bin Chang,et al.  A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems , 1997 .

[49]  Guohe Huang,et al.  An inexact stochastic quadratic programming method for municipal solid waste management , 2008 .

[50]  G. Huang,et al.  An interval-parameter two-stage stochastic integer programming model for environmental systems planning under uncertainty , 2006 .