A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems
暂无分享,去创建一个
[1] Dexian Huang,et al. An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers , 2009, Comput. Oper. Res..
[2] Sanja Petrovic,et al. An Introduction to Multiobjective Metaheuristics for Scheduling and Timetabling , 2004, Metaheuristics for Multiobjective Optimisation.
[3] Ling Wang,et al. An effective hybrid particle swarm optimization for no-wait flow shop scheduling , 2007 .
[4] Taïcir Loukil,et al. Solving multi-objective production scheduling problems using metaheuristics , 2005, Eur. J. Oper. Res..
[5] Józef Grabowski,et al. Sequencing of jobs in some production system , 2000, Eur. J. Oper. Res..
[6] Colin R. Reeves,et al. A genetic algorithm for flowshop sequencing , 1995, Comput. Oper. Res..
[7] Ling Wang,et al. A hybrid differential evolution method for permutation flow-shop scheduling , 2008 .
[8] Mehmet Fatih Tasgetiren,et al. A Discrete Differential Evolution Algorithm for the No-Wait Flowshop Scheduling Problem with Total Flowtime Criterion , 2007, 2007 IEEE Symposium on Computational Intelligence in Scheduling.
[9] Jacques Carlier,et al. Ordonnancements à contraintes disjonctives , 1978 .
[10] Mehmet Fatih Tasgetiren,et al. A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem , 2008, Comput. Oper. Res..
[11] Jean-Charles Billaut,et al. Multicriteria optimisation theory , 2002 .
[12] Piotr Czyzżak,et al. Pareto simulated annealing—a metaheuristic technique for multiple‐objective combinatorial optimization , 1998 .
[13] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[14] Ling Wang,et al. A Hybrid Quantum-Inspired Genetic Algorithm for Multiobjective Flow Shop Scheduling , 2007, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).
[15] Reza Tavakkoli-Moghaddam,et al. A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness , 2007, Inf. Sci..
[16] Quan-Ke Pan,et al. An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion , 2008 .
[17] R. Storn,et al. Differential evolution a simple and efficient adaptive scheme for global optimization over continu , 1997 .
[18] Ali Allahverdi,et al. New heuristics for no-wait flowshops to minimize makespan , 2003, Comput. Oper. Res..
[19] Thomas Stützle,et al. A review of metrics on permutations for search landscape analysis , 2007, Comput. Oper. Res..
[20] C. Rajendran,et al. Heuristic algorithms for scheduling in the no-wait flowshop , 1993 .
[21] Hans Röck,et al. The Three-Machine No-Wait Flow Shop is NP-Complete , 1984, JACM.
[22] Jose M. Framiñan,et al. Approximative procedures for no-wait job shop scheduling , 2003, Oper. Res. Lett..
[23] R. L. Daniels,et al. Multiobjective flow-shop scheduling , 1990 .
[24] Chandrasekharan Rajendran,et al. A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan , 1994 .
[25] Lothar Thiele,et al. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..
[26] Józef Grabowski,et al. Some local search algorithms for no-wait flow-shop problem with makespan criterion , 2005, Comput. Oper. Res..
[27] R. Suresh,et al. Pareto archived simulated annealing for job shop scheduling with multiple objectives , 2006 .
[28] Han Hoogeveen,et al. Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing , 2000, Eur. J. Oper. Res..
[29] Joshua D. Knowles,et al. On metrics for comparing nondominated sets , 2002, Proceedings of the 2002 Congress on Evolutionary Computation. CEC'02 (Cat. No.02TH8600).
[30] Rainer Storn,et al. Differential Evolution – A Simple and Efficient Heuristic for global Optimization over Continuous Spaces , 1997, J. Glob. Optim..
[31] Vinícius Amaral Armentano,et al. Genetic local search for multi-objective flowshop scheduling problems , 2005, Eur. J. Oper. Res..
[32] Maurice Bonney,et al. Solutions to the Constrained Flowshop Sequencing Problem , 1976 .
[33] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[34] C. Rajendran,et al. A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs , 2006 .
[35] Nicolas Monmarché,et al. PII: S0377-2217(02)00265-5 , 2002 .
[36] D. Ravindran,et al. Flow shop scheduling with multiple objective of minimizing makespan and total flow time , 2005 .
[37] Chandrasekharan Rajendran,et al. A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs , 2005, Eur. J. Oper. Res..
[38] D. Chaudhuri,et al. Heuristic algorithms for continuous flow-shop problem , 1990 .
[39] A. S. Spachis,et al. Heuristics for flow-shop scheduling , 1980 .
[40] Stefan Voß,et al. Solving the continuous flow-shop scheduling problem by metaheuristics , 2003, Eur. J. Oper. Res..
[41] B. Růžek,et al. Differential Evolution Algorithm in the Earthquake Hypocenter Location , 2001 .
[42] Godfrey C. Onwubolu,et al. Scheduling flow shops using differential evolution algorithm , 2006, Eur. J. Oper. Res..
[43] Joni-Kristian Kämäräinen,et al. Differential Evolution Training Algorithm for Feed-Forward Neural Networks , 2003, Neural Processing Letters.
[44] Jack Heller,et al. Some Numerical Experiments for an M × J Flow Shop and its Decision-Theoretical Aspects , 1960 .
[45] Lawrence Davis,et al. Job Shop Scheduling with Genetic Algorithms , 1985, ICGA.
[46] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[47] M. F. Tasgetiren,et al. A hybrid discrete particle swarm optimization algorithm for the no-wait flow shop scheduling problem with makespan criterion , 2008 .
[48] Hisao Ishibuchi,et al. Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling , 2003, IEEE Trans. Evol. Comput..
[49] Ali Allahverdi,et al. No-wait flowshops with bicriteria of makespan and maximum lateness , 2004, Eur. J. Oper. Res..