Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring

Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the construction time-cost-quality tradeoff for the planning or design phase, built on static empirical data. However, due to its intrinsic uncertainties, rockfill dam construction is a dynamic process which requires the tradeoff to adjust dynamically to changes in construction conditions. In this study, a dynamic time-cost-quality tradeoff (DTCQT) method is proposed to balance time, cost, and quality at any stage of the construction process. A time-cost-quality tradeoff model is established that considers time cost and quality cost. Time, cost, and quality are dynamically estimated based on real-time monitoring. The analytic hierarchy process (AHP) method is applied to quantify the decision preferences among time, cost, and quality as objective weights. In addition, an improved non-dominated sorting genetic algorithm (NSGA-II) coupled with the technique for order preference by similarity to ideal solution (TOPSIS) method is used to search for the optimal compromise solution. A case study project is analyzed to demonstrate the applicability of the method, and the efficiency of the proposed optimization method is compared with that of the linear weighted sum (LWS) and NSGA-II.抽象目 的施工进度-成本-质量均衡是面板堆石坝工程成功的关键。目前的均衡研究建立在静态经验数据上, 仅针对规划和设计阶段, 难以适应施工过程的动态性和不确定性。基于面板堆石坝施工质量实时监控技术, 考虑动态决策偏好, 本文提出施工进度-质量-成本动态均衡方法, 以实现面向过程管理的进度-质量-成本均衡。创新点1. 提出基于面板堆石坝施工质量实时监控技术的施工进度、质量和成本动态预测方法; 2. 提出施工决策偏好动态量化方法; 3. 提出施工进度-质量-成本多目标均衡求解算法。方 法1. 通过分析实时监控数据, 更新仿真模型参数, 仿真得到施工进度, 再推导出质量和成本(图4、公式(8)和(10)); 2. 采用层次分析法, 动态量化施工过程中的管理者决策偏好, 得到进度-质量-成本三目标间的权重(图5); 3. 采用改进的带精英策略的非支配排序遗传算法(公式(13)), 求解动态均衡问题的Pareto 解, 并运用逼近理想解的排序法筛选出最优折衷方案(图5)。结 论1. 基于实时监控进行施工进度、质量和成本的动态预测, 提高了均衡结果与实际施工过程的一致性; 2. 动态量化决策偏好, 并在优化求解中予以考虑, 有助于最优折衷方案的筛选; 3. 在施工过程中任意阶段开展的施工进度-质量-成本动态均衡适应了施工条件的动态变化, 可有效指导现场施工管理。

[1]  Vince Thomson,et al.  A review of research on cost of quality models and best practices , 2006 .

[2]  Gholamreza Heravi,et al.  Cost of Quality Evaluation in Mass-Housing Projects in Developing Countries , 2014 .

[3]  Madjid Tavana,et al.  A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems , 2014, Expert Syst. Appl..

[4]  Xi Jin,et al.  Multi-objective optimization of water supply network rehabilitation with non-dominated sorting Genetic Algorithm-II , 2008 .

[5]  Osama Moselhi,et al.  RFID+ for Tracking Earthmoving Operations , 2012 .

[6]  James E. Kelley,et al.  Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .

[7]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[8]  Önder Halis Bettemir,et al.  A hybrid genetic algorithm for the discrete time-cost trade-off problem , 2012, Expert Syst. Appl..

[9]  I. Yang Stochastic time–cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance , 2011 .

[10]  徐晓东,et al.  Single crystal β-Ga 2 O 3 : Cr grown by floating zone technique and its optical properties , 2007 .

[11]  Edward G. Schilling,et al.  Juran's Quality Handbook , 1998 .

[12]  Li Zilong,et al.  Compaction quality assessment of earth-rock dam materials using roller-integrated compaction monitoring technology , 2014 .

[13]  Gholamreza Heravi,et al.  Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects , 2014 .

[14]  Jingjing Du,et al.  Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization , 2014 .

[15]  Bo Cui,et al.  Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam , 2009 .

[16]  Jianrong Tan,et al.  Robust optimization of structural dynamic characteristics based on adaptive Kriging model and CNSGA , 2015 .

[17]  Can Akkan,et al.  Network decomposition-based benchmark results for the discrete time-cost tradeoff problem , 2005, Eur. J. Oper. Res..

[18]  Carl T. Haas,et al.  Assignment and Allocation Optimization of Partially Multiskilled Workforce , 2002 .

[19]  Mohamed K. Omar,et al.  An improved model for the cost of quality , 2014 .

[20]  Chung-Wei Feng,et al.  The LP/IP hybrid method for construction time-cost trade-off analysis , 1996 .

[21]  Berardo Naticchia,et al.  Design and first development of an automated real‐time safety management system for construction sites , 2009 .

[22]  Donghai Liu,et al.  Real-Time Quality Monitoring and Control of Highway Compaction , 2016 .

[23]  Mohammad Reza Nikoo,et al.  A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects , 2015, Expert Syst. Appl..

[24]  Amir Abbas Najafi,et al.  A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations , 2014, Comput. Oper. Res..

[25]  Omid Bozorg Haddad,et al.  Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO , 2012, Expert Syst. Appl..

[26]  Khaled A El-Rayes,et al.  Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .

[27]  C. E. SHANNON,et al.  A mathematical theory of communication , 1948, MOCO.

[28]  Ching-Lai Hwang,et al.  Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.

[29]  Zhang Ping Theory and application of construction simulation for high core rock-fill dam based on real-time monitoring , 2009 .

[30]  Genichii Taguchi,et al.  Introduction to quality engineering. designing quality into products a , 1986 .

[31]  Prabuddha De,et al.  Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks , 1997, Oper. Res..

[32]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[33]  Julio C. Martinez,et al.  Reduction of Short-Interval GPS Data for Construction Operations Analysis , 2005 .

[34]  Neil N. Eldin,et al.  DYNAMIC PROGRAMMING ApPROACH TO SCHEDULING OF NONSERIAL LINEAR PROJECT , 1996 .

[35]  Min-Yuan Cheng,et al.  Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem , 2015, Knowl. Based Syst..

[36]  C. Hwang Multiple Objective Decision Making - Methods and Applications: A State-of-the-Art Survey , 1979 .

[37]  Manoj Kumar Tiwari,et al.  A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project , 2013, Eng. Appl. Artif. Intell..

[38]  Nicole Radziwill Cost of Quality (CoQ) metrics for telescope operations and project management , 2006, SPIE Astronomical Telescopes + Instrumentation.

[39]  Mario Vanhoucke,et al.  The discrete time/cost trade-off problem: extensions and heuristic procedures , 2007 .

[40]  Khaled A El-Rayes,et al.  Scheduling of repetitive projects with cost optimization , 1993 .

[41]  Yixiong Feng,et al.  Interval multiobjective optimization of structures based on radial basis function, interval analysis, and NSGA-II , 2014 .

[42]  Akif Asil Bulgak,et al.  A cost of quality decision support model for lean manufacturing: activity‐based costing application , 2013 .

[43]  John F. Muth,et al.  A Dynamic Programming Algorithm for Decision CPM Networks , 1979, Oper. Res..

[44]  Jing Sun,et al.  Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data , 2012 .

[45]  Amir Azaron,et al.  A genetic algorithm approach for the time-cost trade-off in PERT networks , 2005, Appl. Math. Comput..

[46]  Bo Cui,et al.  Real-time compaction quality monitoring of high core rockfill dam , 2011 .

[47]  Wang Cheng-en,et al.  A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution , 2009 .

[48]  Kalyanmoy Deb,et al.  Muiltiobjective Optimization Using Nondominated Sorting in Genetic Algorithms , 1994, Evolutionary Computation.