Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm
暂无分享,去创建一个
Quan-Ke Pan | Ponnuthurai Nagaratnam Suganthan | Tay J. Chua | T. X. Cai | P. Suganthan | Q. Pan | T. Chua | T. Cai
[1] Hartmut Stadtler,et al. Supply chain management and advanced planning--basics, overview and challenges , 2005, Eur. J. Oper. Res..
[2] Ali M. S. Zalzala,et al. Recent developments in evolutionary computation for manufacturing optimization: problems, solutions, and comparisons , 2000, IEEE Trans. Evol. Comput..
[3] Lawrence Davis,et al. Job Shop Scheduling with Genetic Algorithms , 1985, ICGA.
[4] A. G. Lagodimos,et al. Greedy heuristic algorithms for manpower shift planning , 2000 .
[5] Ling Wang,et al. An effective hybrid particle swarm optimization for no-wait flow shop scheduling , 2007 .
[6] Rudy Hung. Multiple-shift workforce scheduling under the 3–4 workweek with different weekday and weekend labor requirements , 1994 .
[7] Quan-Ke Pan,et al. An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion , 2008 .
[8] Turgut Aykin,et al. A comparative evaluation of modeling approaches to the labor shift scheduling problem , 2000, Eur. J. Oper. Res..
[9] Roberta S. Russell,et al. A Study of Labor Allocation Strategies in Cellular Manufacturing , 1991 .
[10] Ling Wang,et al. An Effective Hybrid Heuristic for Flow Shop Scheduling , 2003 .
[11] Bernard Grabot,et al. Short-term manpower management in manufacturing systems: new requirements and DSS prototyping , 2000 .
[12] M. F. Tasgetiren,et al. A hybrid discrete particle swarm optimization algorithm for the no-wait flow shop scheduling problem with makespan criterion , 2008 .
[13] Hark Hwang,et al. Another similarity coefficient for the p-median model in group technology , 2003, Int. J. Manuf. Technol. Manag..
[14] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[15] Hamilton Emmons. Work-Force Scheduling with Cyclic Requirements and Constraints on Days Off, Weekends Off, and Work Stretch , 1985 .
[16] Ling Wang,et al. No-idle permutation flow shop scheduling based on a hybrid discrete particle swarm optimization algorithm , 2008 .
[17] Rajiv D. Banker,et al. A model to evaluate variables impacting the productivity of software maintenance projects , 1991 .
[18] Kenneth R. Baker,et al. Workforce Scheduling with Cyclic Demands and Day-Off Constraints , 1977 .
[19] Tay Jin Chua,et al. Dynamic operations and manpower scheduling for high-mix, low-volume manufacturing , 2008, 2008 IEEE International Conference on Emerging Technologies and Factory Automation.